Associated civil work and other related activities. After carrying out the necessary cold checks, the CP System is energized. Tests carried out to ensure the structure is adequately protected with necessary fine tuning. Effective monitoring of the system is carried out as per the pre determined procedure and on course correction is done to achieve the best results.

  • © 2015 Rahi Construction & Automation. All right Reserved ®.
  • Website Designed by Star Web Maker